Grants and funding for solar panels for breweries

The tax reliefs, the Brewing Climate Change Agreement, and the finance routes that make brewery solar pay. Updated for 2026.

There is no single "brewery solar grant" in the UK, and any site promising one is misleading you. What there is instead is a stack of genuine, quantifiable levers, some of them specific to breweries, that together turn a capital cost into a fast-paying asset. Here is how they fit together, and the two claims a lot of installers get wrong.

Capital allowances: the Annual Investment Allowance, not "full expensing"

Solar PV is special-rate plant and machinery for capital allowances (HMRC manual CA22335). That single classification decides everything. It means solar qualifies for the Annual Investment Allowance, which gives a profitable company 100% first-year tax relief on the first £1m of qualifying spend, enough to write off virtually any brewery install in year one, worth up to about 25% of the cost as a corporation-tax saving. It also means solar is excluded from full expensing and from the new 40% first-year allowance, both of which apply to main-rate plant only. If an installer tells you the panels get "full expensing" or "the 40% allowance", they are wrong, and correcting that is one of the simplest ways to check you are dealing with a specialist. Above the £1m cap, solar gets a 50% first-year allowance and then a 6% writing-down allowance on the balance. Take your own tax advice, because the benefit depends on your profits and your position.

The Brewing Climate Change Agreement: a lever unique to your sector

This is the one a generic commercial-solar site never mentions. The brewing sector has a Climate Change Agreement, an umbrella deal run through the British Beer & Pub Association, under which participating breweries commit to energy-efficiency targets in return for a large discount on the Climate Change Levy (CCL), the per-kWh tax on business energy. Under the new six-year scheme that runs to 31 March 2033, CCA holders pay just 8% of the CCL on electricity, a 92% discount, and 11% on gas, an 89% discount. With the CCL main rate at 0.801p/kWh from April 2026, that is a saving of around 0.74p on every liable kWh, roughly £7,000 a year for a brewery using a million kWh of grid electricity.

On-site solar helps your CCA in two separate ways. First, electricity you generate and consume on site is not liable for the Climate Change Levy at all, so every kWh the panels displace removes the levy entirely. Second, self-generated renewable power improves your energy-per-hectolitre figure, which is the metric your CCA target is measured against. One honest caveat: larger regional and national breweries meet the energy-intensity threshold comfortably, but many small craft breweries may not individually qualify, so check your current eligibility with the BBPA rather than assuming you are in the scheme.

Business rates: a saving that lasts to 2035

In England, eligible on-site renewable generation and co-located battery storage are exempt from business rates until 31 March 2035, so adding solar does not increase your rateable value. This is a durable, certain saving distinct from the tax reliefs above. It is England-specific, so breweries in Wales and Scotland should check their own devolved rating rules.

Export income and the routes with no capital outlay

Surplus generation earns money under the Smart Export Guarantee, but rates are supplier-set and move, so we quote a range, typically 12 to 16p/kWh in 2026, and never a fixed figure. For a brewery the prize is self-consumption, not export, because a unit you use on site is worth far more than a unit you sell. Where capital is the obstacle, asset finance and a Power Purchase Agreement both let you install with little or no money up front, and the Industrial Energy Transformation Fund, which some older guides still list, is now closed with no successor. The routes below set out each lever in detail.

Funding routes for breweries

Plant & Machinery Capital Allowances (Annual Investment Allowance + 50% First-Year Allowance)

UK limited companies (and sole traders/partnerships) investing in commercial solar PV. Solar is special-rate plant and machinery: the Annual Investment Allowance gives 100% year-one relief on the first £1m of qualifying spend and applies to solar, which covers most brewery installs in full.

Value
Up to roughly 25% effective corporation-tax saving in year one on the qualifying spend for a profitable company.

Solar PV is SPECIAL-RATE expenditure (HMRC CA22335, designated special rate from 1 April 2012), so it is EXCLUDED from 100% full expensing (main-rate only) and from the new 40% first-year allowance (main-rate, from 1 January 2026). The routes that apply are: AIA (100% up to £1m, which usually covers a whole brewery install), the 50% first-year allowance for special-rate plant above the £1m cap, then a 6% writing-down allowance on the balance in the special-rate pool. Never present 'full expensing' or the '40% FYA' as applying to the panels. Figures are illustrative and depend on the company's profits and tax position, so confirm with your accountant.

Official information →

Brewing-Sector Climate Change Agreement (CCA) & Climate Change Levy relief

The brewing sector has a Climate Change Agreement umbrella agreement run through the British Beer & Pub Association (BBPA); the malting sector's is administered by the Maltsters' Association of Great Britain (MAGB). Participating sites commit to energy-efficiency/carbon targets in return for a large discount on the Climate Change Levy (CCL) on their business energy.

Value
From 1 April 2026, CCA holders pay just 8% of the CCL main rate on electricity (a 92% discount) and 11% on gas (an 89% discount). With the CCL main rate at 0.801p/kWh, that is a saving of roughly 0.74p on every liable kWh, around £7,000 a year on a brewery using 1,000,000 kWh of grid electricity.

A new six-year CCA scheme (SI 2025/813) runs from 1 January 2026 with CCL relief available to 31 March 2033; applications open annually 1 January to 31 August. On-site solar helps in two separate ways: (1) electricity you generate and consume on-site is not liable for CCL at all, so every kWh the panels displace from the grid removes the levy entirely; and (2) self-generated renewable power improves your energy-per-hectolitre metric, the figure your CCA target is measured against. Honesty caveat: larger regional and national breweries meet the energy-intensity threshold comfortably, but many small craft breweries may not individually qualify, check current eligibility with the BBPA rather than assuming every brewery is in the scheme.

Official information →

Business-Rates Exemption for On-Site Renewable Generation & Storage

In England, eligible plant and machinery used for on-site renewable generation and co-located battery storage, where the power is consumed within the property, is exempt from business rates.

Value
The solar and battery plant is excluded from the rateable value, removing what would otherwise be an ongoing annual rates cost on the equipment.

Introduced by the Non-Domestic Rating (green reliefs) regulations, running 1 April 2022 to 31 March 2035 (brought forward a year from the originally-announced 2023). England-specific, Scotland and Wales have separate rating regimes, and tied to power consumed on site.

Official information →

Smart Export Guarantee (SEG)

All MCS-certified PV installs up to 5 MW in Great Britain, with a meter capable of recording half-hourly export. The larger licensed suppliers must offer an export tariff.

Value
Supplier-set, with typical fixed export tariffs around 12 to 16p/kWh in 2026 (the whole market spans under 4p to the mid-teens, and some import-linked tariffs pay more at peak).

Rates are set by the supplier, not by Ofgem, and only have to be above zero, so it pays to shop around and they change, Octopus cut its flagship export rate to 12p on 1 March 2026, and British Gas cut its SEG in 2026, which is why we quote a range and never a fixed figure. For a brewery with a continuous refrigeration baseload, self-consumption is the main prize and export is a secondary value stream, because most generation is used on site at a far higher per-kWh value than export.

Official information →

PPA & Asset Finance (zero or low-capital routes)

Available to most trading breweries, including tenants on leased units. A PPA needs no capital; asset finance spreads the cost over the system life.

Value
PPA: day-one savings versus grid with zero capex. Asset finance: typically cash-flow positive from month one over a 5 to 7 year term.

A Power Purchase Agreement suits tenants and shorter leases, a funder owns the array and you buy the power below grid. Asset finance keeps the system on your balance sheet as an owned asset. Sector support also exists but is not cash-grant funding: SIBA's Sustainability Strategy (net zero for independent brewing by 2045) provides a free carbon-measurement tool, and the BBPA/Zero Carbon Forum publishes a Zero Carbon Calculator and Toolkit; regional net-zero loans exist in the devolved nations (for example Business Energy Scotland part-funded Stewart Brewing's 210 kWp array with an interest-free loan). Note the Industrial Energy Transformation Fund (IETF) is closed with no successor, so it is not a route we present. We model cash, finance and PPA side by side so you can compare like for like.

Official information →

Map the funding for your brewery

Responds within one working day

  • 1. Free desk feasibility from your meter data and roof, no obligation.
  • 2. Site survey and a fixed-price proposal, itemised in writing.
  • 3. Install and aftercare by MCS-certified engineers.
  • MCS Certified
  • NICEIC
  • RECC
  • TrustMark

By submitting you agree to our privacy policy. We never sell your details.

Accredited and certified for UK commercial work

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001 / 14001

Commercial Solar Across the UK

Visit the UK hub for commercial solar installation.